Property Information
Address:
Site Four, Piper Street, Dundee
, DD4 0NT
Price: Property no longer available.
Size: 436681 sq ft40568 sqm
Primary Category: Investment
All Categories:
Investment,
Property Ref/Movehut: MH571053
Property Ref/Agent: Ryden_3863
*Please use the agent ref when calling the agent directly.
Property description
The premises comprise a substantial modern industrial facility comprising a large workshop and office building and various smaller secondary buildings, including a canteen/staff building, built on a large site extending to approximately 1.905 hectares/4.708 acres. The main building provides a substantial workshop of steel portal frame construction with an eaves height of approximately 7.5 metres.
The workshop has concrete block infill walls to dado height and double skin insulated profile aluminium cladding to the external walls and the roof.
The workshop is well specified with M&E services including sodium pendant lighting, a sprinkler system and a gas fired warm air ducted heating supplemented by gas fired roof-hung radiant heaters.
There are three gantry cranes within the workshop - 2 x SWL 1 tonne and 1 x SWL 5 tonne capacity.
There is an engineering office at mezzanine floor level above the workshop toilets and storage room, plus mezzanine floor storage above the switch room accommodation.The office accommodation is situated at the rear of the main building and provides quality accommodation, laid out at ground floor level to provide a reception area and a mix of open plan and cellular management offices.
In addition, at ground floor level there is a further workshop office and laboratory accessed from the main workshop.
The first floor provides a mix of open plan and cellular office space, together with ladies and gents toilets and a small kitchen area. Ancillary buildings include a detached canteen/staff building towards the rear of the site, a detached sprinkler house to the east of the main building, an open fronted storage building towards the front and a security kiosk at the main entrance to the site.There is surfaced car parking to the front and rear of the main building, with parking for approximately 50 cars, plus additional parking to the west of the main building accommodating a further 10 cars.
;